How Is Pleated Blind Installation Done?
Installation consists of measurement, profile cutting, channel placement and fabric tensioning steps. Every step is done by the professional team. Installation time varies by number of windows.
Single window installation takes 20-30 minutes. One room (3-4 windows) is installed in 1-1.5 hours. Whole house (8-12 windows) is completed in half a day.
| Step | Duration | Action |
|---|---|---|
| 1. Measurement | 5 min | Width and height taken |
| 2. Profile cutting | 5 min | Profile adjusted to measurement |
| 3. Channel mounting | 5 min | Top and bottom channels fitted |
| 4. Fabric tensioning | 5 min | String mechanism adjusted |
| 5. Test | 5 min | Open-close check |
Mounting Types
There are three main mounting types. The suitable type is selected according to window structure and fabric weight. Screwed is preferred for heavy fabrics, adhesive or hooked for light fabrics.
- Screwed — sturdiest, for heavy fabric
- Adhesive — drill-free, tenant-friendly
- Hooked — removable, cleaning-friendly
- Portrait — aesthetic, thin profile
Installation Warranty
All installation work is done with a 2-year warranty. Mechanism adjustment, profile tightening and fabric tensioning are included in the warranty. If a problem occurs, free service is provided.
- 2-year warranty document is given after installation
- Free service for mechanism problems
- Free tightening for profile loosening
- Free tensioning for fabric sagging
Installation Regions
Our Istanbul-based installation team serves across Turkey. Free survey and installation within Istanbul, product shipping and video installation support in other cities.
- Istanbul — free survey + installation
- Kocaeli, Yalova, Sakarya — survey + installation
- Ankara, Izmir, Bursa — cargo + local installation
- Other cities — cargo + video installation support